Advanced Technology Services
Comprehensive Maintenance Case Study
Pages
1
Time to read
2 mins
Publication
Language
English
Pages
1
Time to read
2 mins
Publication
Language
English
This case study details the rapid response of the ATS team to a critical equipment failure at a hydraulic manufacturer’s plant in Newbern, TN. The incident began when a mixer experienced a drive failure due to a transformer malfunction, resulting in a significant electrical surge. This failure not only halted operations at the plant but also threatened to cause production losses at multiple facilities. The ATS team quickly identified the root cause and coordinated with the Original Equipment Manufacturer (OEM) to procure a replacement cabinet. They authorized a down payment of $210,000 to expedite the process. Within a short timeframe, the OEM prepared the new cabinet, and the ATS team managed to remove the damaged equipment and install the new one, resolving compatibility issues and ensuring the plant was operational by Wednesday morning. The swift actions taken by ATS saved over 500 hours of potential production loss and prevented further disruptions across other facilities.