Armstrong World Industries
Adobe North Tower Ceiling Design Case Study
Pages
2
Time to read
3 mins
Publication
Language
English
Pages
2
Time to read
3 mins
Publication
Language
English
This case study details the ceiling design and installation for Adobe's new 18-story office building located in San Jose, California. The building adds 1.25 million square feet to the corporate campus and accommodates 4,000 employees. The project involved the installation of 202,000 square feet of ceiling panels, with a variety of systems used to enhance the aesthetic and functional aspects of the space. The design team, including Gensler and ProjectWorks, collaborated closely to create custom solutions, such as Armstrong's Custom MetalWorks Blades and Arktura's Vapor Soft Cluster Dense ceiling panels. The study outlines the challenges faced during installation and the innovative approaches taken to ensure that the ceilings not only met design specifications but also contributed to the overall ambiance of the building. Key features included integrated backlighting and custom color matching for different floors, enhancing both visual appeal and wayfinding in the facility.