AVEVA
Kellogg’s Case Study on AVEVA PI System Implementation
Pages
3
Time to read
4 mins
Publication
Language
English
Pages
3
Time to read
4 mins
Publication
Language
English
This case study details Kellogg’s implementation of the AVEVA PI System at its Valls, Spain plant, which produces various cereal brands. The primary objective was to enhance operational efficiency and compliance with stringent food safety regulations. The Valls plant transitioned from a manual weight-control system to a digitized solution, allowing for real-time data collection and analysis. This upgrade resulted in a significant reduction in critical control point incidents by 64%, product failures by 73%, and minor line stops by 67%. The implementation of the AVEVA PI System facilitated proactive maintenance and improved overall equipment effectiveness (OEE), achieving a benchmark rating of 80%. Additionally, the system enabled the creation of digital twins for equipment, enhancing monitoring and maintenance capabilities. The case study outlines the benefits of data analytics in food production and the positive impact on operational standards, cost reduction, and consumer trust.