Immersive Technologies
Rope Shovel Improvement Project at Bingham Canyon Mine
Pages
1
Time to read
3 mins
Publication
Language
English
Pages
1
Time to read
3 mins
Publication
Language
English
This document is a case study detailing the Continuous Improvement Project undertaken by Rio Tinto Kennecott Copper Mine in collaboration with Immersive Technologies and Komatsu. The project aimed to enhance the performance of lower quartile shovel operators by reducing cycle times and machine events associated with electric shovels. The initiative involved a 30-day training program utilizing an Immersive PRO4 Simulator and MineWare data to monitor operator performance before and after training. Key results from the project included a 0.97% improvement in overall cycle time, a 3.78% increase in average payload, and significant reductions in boom jacking and swing impact events. The document also highlights the tools and technologies employed, such as the PRO4-B Advanced Equipment Simulators and various training services. The successful outcomes of this project underscore the effectiveness of simulation-based training in the mining sector.