
INP Deutschland
Medium-voltage Switching System Project for Vetropack
Pages
2
Time to read
2 mins
Publication
Language
English

Pages
2
Time to read
2 mins
Publication
Language
English
This technical report details the medium-voltage switching system project undertaken for Vetropack at their glass factory in St. Prex, Switzerland. The project involved replacing an existing glass melt furnace and constructing three new storage buildings to enhance logistics, with a total investment of 36 million Swiss francs. The report outlines the services provided by INP Switzerland, including project management, quality assurance, pre-project planning, basic and detail engineering, installation supervision, and project supervision. Specific tasks included consulting on the power station and medium-voltage system, generating detailed construction drawings, and ensuring compliance with applicable regulations. The report also describes the components of the new power station, including transformers and the medium-voltage system, along with the commissioning of the MV switching system and protection relays. The document serves as a comprehensive account of the project's scope, objectives, and technical specifications.