IPEX
Lakeview Wastewater Treatment Plant Expansion Overview
Pages
2
Time to read
4 mins
Publication
Language
English
Pages
2
Time to read
4 mins
Publication
Language
English
This case study details the expansion of the Lakeview Wastewater Treatment Plant (WWTP) in the Region of Peel, Ontario, which was originally built in the late 1950s. The facility underwent a significant expansion in 2009, costing $260 million, to increase its capacity to treat 137 million gallons per day. This expansion was necessary to accommodate the wastewater needs of over 1.3 million residents and 90,000 commercial businesses in the area. The upgraded plant includes advanced features such as a new headworks facility, enhanced nitrification, and increased biosolids handling and incineration capacity. The document outlines the installation of the PVC Guardian Double Containment System, which ensures safety and reliability in transporting corrosive chemicals. The system is designed to minimize leaks and reduce installation costs. The case study also highlights the collaboration between IPEX and the project team to ensure effective design and implementation, showcasing the successful outcomes of the project.