Levare
ESP Flowline Water Boosting for Oil Recovery
Pages
1
Time to read
3 mins
Publication
Language
English
Pages
1
Time to read
3 mins
Publication
Language
English
This case study outlines the implementation of an Electric Submersible Pump (ESP) flowline water boosting system by Levare to address urgent oil production needs for a Colombian customer. The client faced significant delays due to the long lead times associated with traditional surface pumping technology. Levare's solution involved delivering a specifically configured ESP system within one month, allowing for the early injection of 50,000 barrels of water per day (BWPD) at a discharge pressure of 1,800 psi. The design included two pumps and a permanent magnet motor, ensuring high efficiency and reduced operational costs. The results demonstrated a positive impact on oil production, achieving a full return on investment within the first thirty days. The system's flexible design facilitated easy relocation to other sites, and the overall project cost was reduced by 40%. This successful implementation has led to discussions about expanding the use of this innovative solution in the industry.