Long International
Calculating the As-Built Critical Path Procedures
Pages
24
Time to read
26 mins
Publication
Language
English
Pages
24
Time to read
26 mins
Publication
Language
English
This technical report outlines the procedures for calculating the as-built critical path of a project schedule. It emphasizes the importance of developing As-Built Calculation Schedules for relevant schedule analysis periods. The report details the process of verifying the accuracy of the as-built schedule by reviewing contemporaneous project records to confirm actual dates. It also discusses the conversion of as-planned logic to as-built logic, highlighting that work activities may have been performed out-of-sequence. Guidelines are provided for rectifying out-of-sequence logic and adjusting the as-built schedule logic to accurately reflect actual work sequences. The report stresses the necessity of determining driving predecessor relationships to avoid subjective assessments in the calculation of the as-built critical path. Furthermore, it addresses the significance of documenting logic revisions and ensuring that the as-built critical path is accurately calculated to support schedule delay claims and forensic schedule analysis.