PublicInput
Benefit-Cost Ratio Calculations for U.S. 23 Corridor Study
Pages
9
Time to read
90 mins
Publication
Language
English
Pages
9
Time to read
90 mins
Publication
Language
English
This technical report presents the benefit-cost ratio calculations for the U.S. 23 Corridor Study, specifically focusing on the preliminary feasibility study conducted in January 2025. The document outlines user benefit calculations for various segments, including daily truck percentages and weighted average values of time for both US 23 and intersections involving all vehicles. It details the projected values for input into the USDOT cost-benefit spreadsheet, including various concepts and no-build scenarios for the years 2030 through 2050. The report includes a comprehensive set of data reflecting arterial delays and intersection delays across different concepts, providing a clear view of the expected costs and benefits associated with each scenario. The calculations are scaled and presented in a structured format, allowing for straightforward analysis of the projected outcomes over the specified time frame.